2026 Projects

Current-season maintenance work — status, notes, owner
← Healthy Roads
A snapshot of what's underway, scheduled, and completed this season across our 5.15 miles of private roads. Project links open the corresponding map or record.
Status: In Progress Scheduled To Be Scheduled Completed Cancelled
💧
In Progress
Outfalls cleared per plan so no standing water remains in culverts.
Budget$9,500
Owner: Larry Harris
🚜
Scheduled · Aug/Sept
Shoulder blading and silt removal at locations flagged on the drainage map.
Budget$7,175 blading  +  $5,950 drainage cleaning (budget $5,000; bid came in higher to address plow damage on Wildcat Spur)
Owner: Gary Hein
💧
To Be Scheduled
Minor shovel and weeding at several culverts; mechanical cleaning and rip-rap at a few. Locations identified on the 2026 culvert map.
Budget$2,200 (reserve — not yet allocated; buffer if scope grows)
Owner: TBD
🌿
To Be Scheduled · after blading
400+ vegetation detections in and beside the road. Blading removes some; follow with a broadcast pre-emergent and broadcast or spot-spray for what remains.
Budget$2,065 (roadside spraying)
Owner: TBD
🛠
To Be Scheduled
Multiple potholes and surface damage throughout the neighborhood. Cold-patch repair by neighborhood volunteers or contractor.
Budget$300 (pothole patching materials)
Owner: TBD
🔍
Completed
All culverts inspected for debris and internal damage where accessible. Map and photos updated.
Owner: Gary Hein
Mag Chloride
Cancelled
Mag chloride costs have quadrupled — no longer cost-effective for our turn-around areas.
Budget$965 (unspent — project cancelled)
Owner: Gary Hein